Sale!

N-Channel MOSFET, 171 A, 150 V Long Lead TO-247AC Infineon AUIRFP4568-E

Original price was: £6,30.Current price is: £1,89.

SKU: ET26024898 Category: Tag:

Description

Maximum Drain Source Voltage: 150 V

Maximum Continuous Drain Current: 171 A

Mounting Type: Surface Mount

Series: HEXFET

Channel Type: N

Package Type: Long Lead TO-247AC

This is N-Channel MOSFET 171 A 150 V Long Lead TO-247AC manufactured by Infineon. The manufacturer part number is AUIRFP4568-E. It has a maximum of 150 v drain source voltage. While 171 a of maximum continuous drain current. The product is available in surface mount configuration. The product hexfet, is a highly preferred choice for users. The product is available in [Cannel Type] channel. The package is a sort of long lead to-247ac.

Reviews

There are no reviews yet.

Be the first to review “N-Channel MOSFET, 171 A, 150 V Long Lead TO-247AC Infineon AUIRFP4568-E”

Your email address will not be published. Required fields are marked *